Funding rules monitored: 31 official sources · awaiting first verified checkFunding Intelligence →
Skip to the Academy content

Topic

Planned hours: what counts and how to evidence it

Planned hours set the funding band and therefore the rate for the whole year. What may be counted, what must be evidenced, and how to reconcile hours to a timetable.

Funding year2026–27Awaiting verificationReviewed18 September 2026See the sourcesReport an issue

Enough detail to do the job and hold a sensible conversation with MIS or Finance.

How to read this page
  • Official requirement: Stated by the official funding document named in the sources for this page.
  • FEFunding explanation: Our plain-English explanation. Helpful, but the official document is the rule.
  • Worked example: An illustration of how the rule applies in one situation. Not a universal rule.
  • Recommended good practice: Operational advice from FEFunding. Not itself a funding requirement.

What can be counted

Planned hours are the hours of planned, timetabled, education-related activity for a student in the year.

They include qualification teaching and other planned activity that supports the programme, such as work experience and tutorial.

The hours have to be planned, timetabled and something the college can show actually happened.

Two categories are recorded: planned learning hours for qualification delivery, and planned employability, enrichment and pastoral hours for the rest.

The conditions on what may be counted are set out in the funding rules for the funding year and are more specific than most people assume. Activity that is not planned, not timetabled or not education-related does not count, however valuable it is.

Official requirement

A 16 to 19 student's funding band is determined by their planned hours for the year, which is the total of planned qualification hours and other planned, timetabled, education-related activity.

Check the funding rules for the funding year for the current treatment of each category of activity before including it. The treatment of individual activity types has changed between years.

Record the hours from the timetabling system rather than from a programme template, and retain the reconciliation as the evidence for the figure recorded.

Evidencing the hours

The evidence for planned hours is the timetable, plus something showing the timetabled activity actually took place.

A figure that cannot be reconciled to a timetable is a funding risk, however reasonable it looks.

The reconciliation itself is the evidence. Produce it once a year, before the December return, keep it, and update it after any material timetable change.

Pay particular attention to students sitting just above a band threshold. That is where a small hours error has the largest funding consequence and where testing concentrates.

Produce the reconciliation at programme level and at student level for any student within a small margin of a band threshold.

Where enrichment or other non-qualification activity is withdrawn mid-year, revisit the hours: this is one of the most common causes of an unreconcilable figure at audit.

Where hours go wrong in practice

Three patterns account for most planned hours problems, and all three are preventable.

  • Hours set from a programme template rather than from what each student is actually timetabled for.
  • Timetabled activity withdrawn during the year, with the hours never revisited.
  • Activity counted that does not meet the conditions in the funding rules.

The template problem is the most common and the easiest to spot: every student on a programme carries an identical figure, which almost never reflects reality once enrolment patterns, resits and individual timetables are taken into account.

The withdrawal problem is the most common cause of a reconciliation failing at audit. A session is dropped after half term, the timetable changes, and nothing prompts anybody to revisit the recorded hours. It feels like a timetabling decision rather than a funding one.

The third problem is subtler. Activity that is genuinely valuable to students is not automatically fundable hours: the rules set conditions, and activity that is not planned, not timetabled or not education-related does not count however much it benefits the learner.

Students sitting just above a band threshold deserve individual attention, because that is where a small hours error produces the largest funding consequence and where testing naturally concentrates.

Official requirement

A 16 to 19 student's funding band is determined by their planned hours for the year, which is the total of planned qualification hours and other planned, timetabled, education-related activity.

Recommended good practice

Evidence is strongest when it is created at the time of the event it describes and is retrievable without reconstruction. Evidence assembled after a query is asked is weaker and takes longer to produce.

Build three standing checks. First, a variance report showing programmes where every student carries an identical hours figure. Second, a trigger on any timetable change that flags the affected students for an hours review. Third, a list of students within a small margin of each band threshold, reviewed individually.

Retain each review as part of the reconciliation. The reconciliation is the evidence for the hours claimed, so its history is as valuable as its current state.

Worked examples

Worked example

Reconciling one programme

A Level 3 programme with a cohort of thirty students.

  1. Extract. Export the recorded planned learning and EEP hours per student.
  2. Compare. Pull the delivered timetable for the programme and total the planned, timetabled hours.
  3. Investigate. Identify any student whose recorded figure does not match the timetable for their actual enrolment pattern.
  4. Correct. Update the hours in the student record system from the timetable evidence.
  5. Retain. Keep the reconciliation. It is the evidence for the hours claimed.

A defensible figure with the working shown.

The specific treatment of each activity type must come from the funding rules for the year.

Common pitfalls

Counting activity that does not meet the conditions

What goes wrong: Valuable but unplanned or untimetabled activity is included in the hours.

Consequence: The hours cannot be evidenced against a timetable and the band is unsupported.

Prevention: Check each activity type against the funding rules for the year before including it.

See the diagnostic

What this means for your role

Curriculum manager or head of department

Your timetable is the evidence for a substantial part of the college's 16 to 19 income.

  • Keep the timetable and the recorded hours aligned, including after mid-year changes.

See it play out

Sources

These are the official documents this page rests on. Where a figure, a deadline or an exact rule matters, the document is the authority and this page is the explanation.

Advice: funding rules for 16 to 19 provision 2026 to 2027 (opens in a new tab)

GOV.UKOfficial funding document2026–27Awaiting first verification

16 to 19 funding 2026 to 2027: rates and formula (opens in a new tab)

GOV.UKOfficial funding document2026–27Awaiting first verification

Adult Skills Fund funding and performance management rules 2026 to 2027 (opens in a new tab)

GOV.UKOfficial funding document2026–27Awaiting first verification

Content reused from GOV.UK is Crown copyright, used under the Open Government Licence. FEFunding is not endorsed by the Department for Education.