Tool
Generate a readiness checklist
Scoped to your funding stream, the return you are preparing for and your role. Built from 16 version-controlled templates, so the same choices always produce the same checklist and nothing is invented.
R03 readiness · 2026-27
38 checks across 10 areas
0 of 38 ticked. Ticks are kept on this page only and are cleared when you leave.
Monthly return readiness
The checks to run before every ordinary return. Short, repeatable, and the reason the consequential returns are manageable.
Red flags
- Learners with no attendance recorded for several weeks
- Learners past their planned end date with no explanation
- A curriculum area that does not recognise names on its own list
Red flags
- A whole cohort with no outcomes recorded
- Outcomes outstanding from a results window that closed weeks ago
- The same awarding organisation appearing repeatedly
Red flags
- A large number of failures of a single rule
- Warnings dismissed without being read
- The same failures recurring every period
Red flags
- A material movement nobody can account for
- A movement with an unchanged learner count
- Reconciliation performed only at year end
Red flags
- A backlog of unprocessed notifications
- Actual end dates clustering on processing dates rather than attendance dates
- Withdrawals recorded weeks after the last attendance
Funding audit readiness
What to have in place before an audit, across every stream. Most of it is the routine you should be running anyway.
Red flags
- Evidence checked visually and handed back
- Evidence held by an individual rather than in a shared store
- A tick box recording that a check took place, with nothing behind it
Red flags
- Support monitoring codes applied to a whole group
- Support delivered informally with no record
- No assessment dated before the support began
Red flags
- Evidence held by individuals
- Evidence in more than one place with no index
- A low retrieval rate
Red flags
- The same records recurring every period
- Reports received and not worked
- Correct records changed to empty a report
Red flags
- Bulk updates with no documented specification
- Material changes between returns with no explanation
- Changes made by people without the authority to make them
Red flags
- Missing periods
- Reports not retained
- No single location for the archive
Red flags
- New ULNs created where an existing one should have been found
- Two records with the same date of birth and address
- Duplicates clustering around one enrolment period
Apprenticeship assurance
The apprenticeship-specific checks that sit alongside the general routine.
Red flags
- Apprentices on the ILR with no match in the service
- Prices, start dates or standards differing between the two
- A single employer with several unmatched apprentices
Red flags
- Breaks running far longer than the programme's normal duration
- Breaks with no recorded evidence of intention to return
- A stated return date that has passed more than once
Red flags
- Records created retrospectively
- Identical records across a whole cohort
- No training plan to reconcile against
Red flags
- Missing signatures
- Documents dated after the start
- Generic statements not specific to the apprentice
Red flags
- Above-band amounts with no written agreement
- Prices differing between the ILR and the service
16 to 19 assurance
The 16 to 19 specific checks, focused on the areas that are tested most often.
Red flags
- Every student on a programme carrying an identical figure
- Hours including activity withdrawn during the year
- Students sitting just above a band threshold
Red flags
- Activity counted with no register
- Activity withdrawn mid-year with hours unchanged
Red flags
- Exemptions applied without evidence
- Students with no recorded aim and no exemption
Learning support evidence
A focused review of the learning support chain, which is one of the most consistently tested areas in funding audit.
Red flags
- Codes applied as a group default
- Plans dated after support began
- No plan at all
Red flags
- Support delivered and never claimed
- Plans with no delivery recorded
Red flags
- Costs absorbed in general staffing with no attribution
- Costs estimated retrospectively
Devolved provision assurance
Checks where adult provision is funded by a combined or strategic authority rather than nationally.
Red flags
- The college's own postcode appearing as a learner's home postcode
- Source of funding entered manually rather than derived
- A cluster of learners from one area with the same mismatch
Red flags
- National rules assumed to apply
- Last year's position carried forward
- No named owner for the relationship
Red flags
- The college's own postcode in learner records
- Addresses entered without evidence
Enrolment quality review
A front-door review, which is where most funding-critical data is captured and where errors are cheapest to prevent.
Red flags
- New ULNs created without a documented failed search
- Learners with more than one ULN
Red flags
- Aims past their funding end date
- Aims not fundable for the stream
- Aims added to the offer without checking
Red flags
- Late joiners sharing the class start date
- Start dates clustering on a single day
Monthly data quality review
The standing data quality review, separate from the return checks, focused on trends rather than individual records.
Red flags
- Counts rising month on month
- Counts produced but never reviewed
- No breakdown by curriculum area
Red flags
- The same records every period
- No owner outside the team clearing the report
Governance assurance pack
What a governing body should see about funding, so assurance rests on measures rather than on reassurance.
Red flags
- Forecast reported without reconciliation
- Movements unexplained
- Only annual reporting
Red flags
- Narrative without numbers
- No owners named
- No trend
Red flags
- Nothing ever reported as wrong
- Issues without a quantified exposure
Red flags
- Findings closed with no evidence of change
- Recurring findings across years
New MIS starter induction
What a new member of an MIS team should be able to do, and by when. Not a funding control, but the thing that most often goes missing.
Red flags
- Induction limited to system training
- No walkthrough of the funding consequence
Red flags
- No map exists
- Map not updated since the last upgrade
Red flags
- Every return treated identically
- No year plan
Sign-off
Optional, and kept on this page only. It is here so a printed or exported checklist carries who completed it and when.
Sources behind these checks
This checklist contains no learner information and must not be used to record any. It is a readiness aid, not a substitute for the funding rules or your own assurance framework.